Project Eagle

  Project Eagle Task List

Before anything

Before anything
Seats removed

Planning. Graph 1" to 1'

Delivery days

First sight

Remove stickers

Checkin it out

Remove luggage racks.
Remove lavatory plumbing.
Polish Eagle emblem.

VIN verification
Pre demolition

Labor Day

Cut up luggage racks.

Remove back inside wall.

Remove walls under windows.
Remove air ducts along floor.

Remove window frames
Remove seats.
Remove entry rail.
Pull up floor.
Under floor treasure.
Fine tunnel.

Remove ceiling

Inside engine cover - clean, seal, and primer.
Inside wall frames - clean and primer.
Rust in wheel well.

Learning to weld.
Repair engine door latch.

Reveal passenger side front wheel well.
Repair wheel well - grind, weld, riveting.

Rivet aluminum siding.
Return wheel well rubber
Reveal rusty driver side wheel well

Holiday Eagle

Repairing wheel well.

Repairing wheel well
Masking tape floor.

Primer wheel well.
Temp plywood floor.
Prepare to rivet aluminum siding.
Remove old glue from back of aluminum.

Overall bus picture.
New hatch cover.
Front license plate
Polish eagle emblem and seal.

Coating ceiling with primer

Overall bus picture in the rain.

Convert double doors to single door.
Access under front bumper.
Remove excess air lines.
Before and after (door).

Fiberglass layer over charter sign area.
Before and after (front of bus).

Buses at the Gathering, Peach Springs, AZ.
Installing new driver window.

Receiving frieght: caps & siding
Preparing for roof raise

Roof raise
cutting caps

Installing rear cap

Installing front cap

Fiberglassing front cap

Fiberglass outside of front cap
Welding inside of rear cap

Revealing old hound paint
A history of our bus

Preparing the passenger side for new skin
Framing for the lower window in livingroom.
Building the frame for the refrigerator vent.
Cutting the Kemlite (Reflections).

Passenger side raising

After the new side is up, putting it back together

Preparing the drivers side frame.
Building the hot water heater door frame.
Raising the side on the drivers side

After the new side is up, putting it back together
Entry door strap
Installing entry door window
Removing bus air unit
Steam cleaning the engine
Discoloration of skin.

Tearing up the floor and replacing it.
Before and after (rear floor)

Floor (continued)

More Floor (continued)

Again - More Floor (continued)

Waterproofing the floor, and more (the walls)

Completed Floor
Holiday Bus

Weather-proofing
Masking tape floorplan

Preparing for insulation
Inside framing
Leakproofing

Preparing for insulation
Bathroom vent
Front cap window template

Spray Insulation
& Cut down

Sand Insulation
Rubberize Roof
Front cap cabinet framing

Sand Insulation
Fiberglass rivets & seam

Window Delivery
More fiberglassing rivets

Finish spraying insulation

Window and wall installation

More window and wall installation

Leakproofing driver side

Driver side windows

Last driver side window

Roof-airs
Skylight
Furring strips
Drop ceiling frame

Furring strips
Refrigerator vent

Wiring the air conditioners
Marker lights
Back up camera

Curved ceiling
Top refrigerator vent

Curved ceiling
Marker lights

Back Cap
Dropped Ceiling - Bedroom & Lights
Dropped Ceiling - Livingroom & Lights

Front cap corners
Front cap cabinet shelf

Front cap (continued)
Front cap shelves (continued)

Front cap window, eagle etched

Body work (Cracked front cap window, new genset)

Front cap window
Genset
Body work

Rewire backup camera
Front dash
Fire extinguisher cabinet

Snow bus

Co-pilot floor
Bed frame
Wall-liner

Headboard
Bedroom cabinet planning

Cardboard cabinet patterns
Calculate tanks
Stain test
Eagle window
Bedroom wallpaper

Wallpaper
Window rings
Cabinets (rear cap, bedroom)

More cabinets
Cabinet face (rear cap, bedroom)

Bay & Generator
Practice headboard woodwork
Decorate fabric

Bed pedestal
Headboard woodwork

Baywork
Bedroom Wood, Wood, Wood

Bedroom cabinets
Headboard
Bed pedestal

Bed
Bed step

Bedroom cabinets
Vinyl ceiling
Bay carpet
Tanks

Bedroom
Vinyl headliner

Wallpaper
Window rings

Bodywork
Primer
Masked
Painted

Painted
Paint wipers
Window blinds

Paint
Shower
Porch light
Trim
Goose-egg
Front Cap
Vinyl Headliner
Vinyl Seam Trim
Ceiling Panels

Bedroom-Bathroom Wall
Shower
Broom Closet
Bedspread
Ceiling Panel
Wiring
Nightstand Countertop Template

Dressers
Bedspread
Bathroom / Kitchen Wall Framing
Black/Grey tank vent

Bedspread
Kitchen / Bathroom Walls
Circuit panel

Circuit panel

Battery bank
Interior wall & pocket door
The last ceiling panels
Bathroom vent ring
Circuit panel lights

Battery master switch
The last enterior wall
Wallpaper
Dresser carcass
Pocket door

Generator
Bedspead

Linoleum flooring
Carpet
Furniture

Bathroom cabinet
Baseboards
Bays
Radiator

Radiator
Hydraulic and other leaks
Clean engine
Bathroom counter
Water system

Air brake compressor
Shower door installation
Shower plumbing
Toilet plumbing
Radio/GPS installation
Bedroom TV installation

Replace air brake compressor and antifreeze
Saturday Shakedown Stroll/a>

Tank bay kemlite
Remote start generator panel
Fuel or electrical problem

Replace some aluminum siding
First dresser drawer
Bathroom cabinet
Kitchen cabinets

Kitchen cabinets
Oven and sink preview
Fine tuning cabinets
Hot water plumbing

Kitchen cabinets
Corian counters

Kitchen &
Bathroom plumbing

Refrigerator &
Pantry cabinet
Underside cabinet face

Pantry
Installing Refridgerator

First upper cabinet
Livingroom TV
Controller / Gage panel
Refrigerator
Out for mural painting

Mural
Cabinet faces

Upper cabinets
Closet doors

Upper cabinets

Front cap

Cabinets
Front cap

Hitch, Baseplate

Window box valances
5 years anniversary!

Medicine cabinet

Flagpoles, Entryway stairs (Linoleum walls)

Mirrors, Entryway stairs (Making the paper mache pulp)

Entryway stairs (Cobblestone flooring)

Project Eagle Home